内华达州新大陆改造计划的操作标准和程序

时间: 2008-07-24


2017-10-01

43 CFR 418

Operating criteria and procedures for the Newlands Reclamation Project, Nevada

2018-07-12

Title 43--Public Lands: Interior

CHAPTER I--BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR

PART 418--OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA


TEXT PDF 418.1 Definitions.
TEXT PDF 418.2 How Project water may be used.
TEXT PDF 418.3 Effect of these regulations on water rights.
TEXT PDF 418.4 Prohibited deliveries.
TEXT PDF 418.5 Responsibility for violations.
TEXT PDF 418.6 Fallon Paiute-Shoshone Indian Reservation.
TEXT PDF 418.7 Who may receive irrigation deliveries.
TEXT PDF 418.8 Types of eligible land.
TEXT PDF 418.9 Reporting changes in eligible land.
TEXT PDF 418.10 Determining the amount of water duty to be delivered.
TEXT PDF 418.11 Valid headgate deliveries.
TEXT PDF 418.12 Project efficiency.
TEXT PDF 418.13 Maximum allowable limits.
TEXT PDF 418.14 Recordkeeping requirements.
TEXT PDF 418.15 Operations monitoring.
TEXT PDF 418.16 Using water for power generation.
TEXT PDF 418.17 Truckee and Carson River water use.
TEXT PDF 418.18 Diversions at Derby Dam.
TEXT PDF 418.19 Diversions from the Truckee River to the Truckee Division.
TEXT PDF 418.20 Diversions from the Truckee River to Lahontan Reservoir, January through June.
TEXT PDF 418.21 Diversion of Truckee River water to Lahontan Reservoir, July through December.
TEXT PDF 418.22 Future adjustments to Lahontan Reservoir storage targets.
TEXT PDF 418.23 Diversion of Rock Dam Ditch water.
TEXT PDF 418.24 Precautionary drawdown and spills from Lahontan Reservoir.
TEXT PDF 418.25 Water use for other than Newlands Project purposes.
TEXT PDF 418.26 Charges for water use.
TEXT PDF 418.27 Distribution system operation.
TEXT PDF 418.28 Conditions of delivery.
TEXT PDF 418.29 Project management.
TEXT PDF 418.30 Provisions required in future contracts.
TEXT PDF 418.31 Conservation measures.
TEXT PDF 418.32 Cooperative programs.
TEXT PDF 418.33 Purpose of the implementation strategy.
TEXT PDF 418.34 Valid headgate deliveries.
TEXT PDF 418.35 Efficiencies.
TEXT PDF 418.36 Incentives for additional long term conservation.
TEXT PDF 418.37 Disincentives for lower efficiency.
TEXT PDF 418.38 Maximum allowable diversion.
TEXT PDF Appendix A Appendix A to Part 418--Calculation of Efficiency Equation

--------------------------------------------------------------------------------

[BACK ][BACK ]